MGF + ACF filter vessels. Industrial multi-grade and activated carbon filters, sized to your flow. Quote in 24 hours.

Engineered for process water, utilities and sensitive industries. Designed for consistent output and low running cost.
Custom sizing
Filters sized to your flow and specification — no compromise.
Built to drawing
Vessels fabricated to our design and inspected by our engineers before dispatch.
Quick dispatch
Fast-track delivery in 30–45 days, anywhere in India.
How MGF + ACF work
Installed as a pair, the two vessels take raw or treated water to process-ready quality.
Multi-grade filter (MGF). Graded layers of sand and gravel trap suspended solids and turbidity. It is the first barrier, protecting everything downstream.
Activated carbon filter (ACF). A bed of activated carbon adsorbs organics, free chlorine, colour and odour from the filtered water.
Together they deliver clean water for RO feed, boilers, cooling towers and process use — and polish treated effluent for reuse.
Applications
Specifications Every unit is configured to your site.
| Vessel | Vertical pressure vessel; diameter and height to suit flow |
|---|---|
| Material | MS with epoxy coating, MSRL, FRP or SS |
| Media | Graded sand and gravel (MGF); granular activated carbon (ACF) |
| Valves | Manual face piping or automatic backwash |
| Support | Installation guidance, commissioning, 1-year warranty and after-sales service |
| Pricing | Itemised B2B quote based on flow, material and configuration — sent within 24 hours |
Questions
What flow rates can your MGF + ACF filters handle?
We size each vessel to your flow — from small utility units to large process lines. Share your flow rate and inlet water quality and we’ll recommend vessel diameter, media depth and the number of units.
Are both manual and automatic valves available?
Yes. Choose manual face piping with valves for simple, low-cost operation, or automatic valves for backwash without operator intervention.
Can these filters be shipped pan-India?
Yes. We dispatch across India, typically 30–45 days from order confirmation, and support installation and commissioning on site.